Modern drilled the successful Grover 2H to a
measured depth of approximately 21,300’ with a horizontal lateral of
approximately 10,000’ into the Eagle Ford Formation.
Modern began drilling October 22, 2021 and
finished drilling November 15, 2021.
Grover 2H Completion
The completion process of Modern’s Grover 2H consisted of
injecting liquid and materials at high pressure to create small fractures
within the Eagle Ford Shale Formation. The operation is finished and is now
considered “completed” and ready to produce oil and or natural gas.
May 3, 2020! We began drilling operations!
Modern drilled on leases in Lavaca County, Texas and drilled to a measured depth of approximately 21,440’ with a horizontal lateral of approximately 10,000’ into the Eagle Ford Formation.